The order confirmation flow is the side that runs after the quote, and it is not the price, it is the spec check, the lot, and the shipping, because the order is the one that has to read to the spec it was quoted against. The buyer who runs the confirmation flow is the one who does not ship a lot that does not read to the order, and this page is the buyer’s view of the flow, the steps in order, and the check at each one.

The confirmation flow, in order
  1. The spec check — the four lines: the grade, the size, the joint, and the pack
  2. The lot — the one the pack ships on, the paper it carries
  3. The shipping — the side the lot runs on to the dock

The spec check is the first step

The first step of the confirmation flow is the spec check, and the check is the one that keeps the order to the quote it was run against. The custom spec FAQ is the four lines the check runs on: the grade, the size, the joint, and the pack, and the technical specs page is the reference the four are read against. The grit standards FAQ is the standard the grade line is read to, and the bore and diameter FAQ is the check the size line is read against. The belt joint types article is the reference the joint line is picked on, and the pack label article is the label the pack line carries. The spec check is the first step, and the four lines are what it reads on.

The lot is the second step

The second step is the lot, and the lot is the one the pack ships on, because the confirmation is the read the lot is confirmed to before it ships. The COC and COA article is the paper the lot carries, and the grade consistency article is the check that keeps the lot even across the runs, so the lot is the one the confirmation is built on. The quality process is the check the lot is made on, and the MOQ article is the minimum the lot needs to run. The lot is the second step, and the paper is what it carries to the shipping.

The shipping is the third step

The third step is the shipping, and the shipping is the side the lot runs on to the dock, because the confirmation is the one that keeps the lot to the destination it was ordered against. The shipping page is the side of the order the shipping runs on, and the terms guide is the money side that sets who carries the leg. The customs guide is the clearing the lot lands on at the entry, and the lead times guide is the window the shipping is planned against. The receiving lot check is the read that keeps the lot to the order when it arrives, and the freight forwarder article is the side that books the leg. Send the quote and the confirmation to the quote request; MoTai confirms the spec check, the lot, and the shipping the order runs on. The flow is the three steps, and the check at each one is what keeps the lot to the order.