Receiving the lot is the check that reads the pack against the order, and the check is the one that keeps the shelf to the spec it was ordered against: the lot number on the pack, the grade against the spec, and the paper that carries the lot. It is the stage where the pack that did not read is the one that does not go to the line, and this page is the receiving desk’s view of the check, the order it runs in, and what a failed check means.
- The lot — the number on the pack against the order
- The grade — the one against the spec it was ordered to
- The paper — the lot’s COC and COA, the check the lot carries
The lot is the first thing the check reads
The first thing the receiving check reads is the lot number on the pack, and the lot is the one the order was placed against, because the pack that does not carry the lot the order named is the one that does not read. The packing standards article is the pack the lot ships in, and the COC and COA article is the paper the lot carries when it arrives. The quality process is the check the lot is made on at the source, and the receiving check is the one that keeps the lot to that check at the dock. The lot is the first read, and the pack is what it is read on.
The grade is the one against the spec
The second read is the grade against the spec it was ordered to, and the grade is the one the technical specs page is the reference for, because the spec is what the order named and the grade is what the pack carries. The grit standards FAQ is the standard the grade is set to, and the grit guide is the band the grade sits on. The trial sample guide is the stage the grade is proved against before the lot ships, and the receiving check is the one that keeps the shipped lot to the proved grade. The grade is the second read, and the spec is what it is read against.
The failed check is the one that stops the line
The failed check is the read that keeps the pack off the line, because the pack that does not read to the order is the one the line should not run on. The MOQ article is the minimum the lot needed to run, and the reorder point article is the stock the check keeps to the pack, so the failed check is the one that stops the pack from reaching the stock it is not read to. The landed cost article is the number the pack carried to the dock, and the check is the one that settles whether the number was the pack the order named. Send the order and the check you run at receiving to the quote request; MoTai confirms the lot and the paper the pack should carry, and the check is the one that keeps the shelf to the order. The check is the read, the lot is what it runs on, and the failed read is the one that stops the line.
