The minimum order quantity is the one the buyer confirms before the run starts, and it is not a fixed number, it is the minimum the pack and the grade need to produce a lot. It is set to the pack, not to the brand, and the buyer who reaches it without over-ordering is the one who groups the grades into the pack the line consumes. This page is the buyer’s view of the minimum, what it is set to, and the way to reach it.

The minimum, at a glance
  • The pack — the lot the grade is produced to, the minimum is set to it
  • The grade — the run is the lot the grade is made on
  • The reach — the pack the line consumes, or the grades grouped into one

The minimum is set to the pack, not the brand

The MOQ is the minimum the pack and the grade need to start a lot, and the pack is what the lot is produced into, not the brand art. The wholesale range carries the minimum per pack, and the packing standards article is the pack side the minimum runs on. The run is the lot the grade is made on, and the grade is the one the technical specs page references, so the minimum is the run the grade and the pack earn together. The brand is the side of the pack the buyer’s label goes on, and the minimum is the one the run needs, not the label.

The small buyer reaches it two ways

The buyer who cannot fill the pack at the full consumption reaches the minimum two ways: the pack the line consumes over the period, or the grades grouped into one pack. The entry budget guide is the math the first order runs on, and the total cost article is the side that settles whether the grouped pack is cheaper than the full pack on the next order. The starter stock guide is the way the first pack is sized against the machines, and the minimum is the one the grouped pack reaches. The two ways are the reach, and the pack is what the minimum is set to.

The program is the scheduled side

The buyer who runs past the minimum runs the scheduled program, and the shipping and OEM page is the side of the order the program runs on. The scheduled supply is the pack the line consumes steadily, and the COC and COA article is the paper the lot carries when it ships. Send the pack, the grades, and the destination to the quote request; MoTai confirms the minimum to the pack and points to the way to reach it, and the quality process covers the lot the run is produced on. The minimum is the run, and the pack is what it is set to.