The custom spec order is the one that runs on the print, and the questions are the four the buyer confirms before the print goes out: the grade, the size, the joint, and the pack. This page is the short answer to the four, and what to confirm on the order, because the order is the one that is read against the print, and the confirmation is the side that keeps the lot to the spec it names.
| The line | What it confirms |
|---|---|
| The grade | The one the spec names, read to the reference |
| The size | The one the machine takes |
| The joint | The one the sander is confirmed to |
| The pack | The one the lot ships in |
The grade and the size are the first two
The first two confirmations are the grade and the size, and they are the ones the print names against the reference. The technical specs page is the reference the grade is read to, and the grit standards FAQ is the standard the grade sits on, so the FEPA and ANSI numbers are the two the grade is confirmed to. The technical specs page also carries the size, and the by-machine guide is the match that keeps the size to the machine it takes. The grade and the size are the first two, and the print is what they are read against.
The joint is the one the sander takes
The third confirmation is the joint, and the joint is the one the sander is confirmed to, because the close is what the strip runs on and the machine is what it takes. The belt joint types article is the reference the joint is picked on, and the belt tracking guide is the check the joint runs on, so the uneven close is the one the tracking reads. The belt life article is the changeover the joint earns on the line, and the confirmation is the one that keeps the joint to the machine before the lot ships. The joint is the third, and the sander is what it is confirmed to.
The pack is the one the lot ships in
The fourth confirmation is the pack, and the pack is the one the lot ships in, because the label is what the receiving desk reads and the pack is what it is read on. The pack label article is the label the four sit on, and the packing standards article is the pack the lot is built into. The writing an RFQ article is the print the order is read on, and the COC and COA article is the paper the lot carries when it ships. Send the print and the confirmation list to the quote request; MoTai returns the order to the spec, with the joint and the pack confirmed, and the quality process covers the lot the spec is made on. The four are the confirmation, and the print is what they are read against.
