The grade even across lots is the check that keeps the line to the spec, and the even is not the lot alone, it is the lot against the paper and the trial, because the line is the one that pays for the uneven read. The buyer who runs the even check is the one who does not stop the line on a lot that does not read to the spec, and this page is the buyer’s view of the even, how to run the check, and what a lot that fails means.
| The side | What it is |
|---|---|
| The trial | The stage that proves the lot against the work |
| The paper | The lot’s COC and COA, the check it carries |
| The read | The receiving check that keeps the lot to the spec |
The trial proves the lot against the work
The first side of the even is the trial, and the trial is the one that proves the lot against the work before it ships to the line, because the even is the read the lot is confirmed to. The trial sample guide is the stage that proves the lot, and the sample-to-volume guide is the order the trial runs in, so the trial is the first of the stages the even is built on. The removal rate article is the cut logic the trial reads on, and the quality process is the check the lot is made on at the source. The trial is the first side, and the proof is what it earns.
The paper is the check the lot carries
The second side is the paper, and the paper is the one the lot carries when it ships, because the even is the read the paper names on the lot. The COC and COA article is the side that keeps the lot to the spec it was ordered against, and the receiving lot check is the read that keeps the paper to the order, so the lot number on the paper is the one the lot is confirmed to. The pack label article is the label the lot is read on, and the packing standards article is the pack the lot ships in. The paper is the second side, and the check is what it carries to the dock.
The failure is the lot that does not ship
The lot that fails the even check is the one that does not ship to the line, because the multi-source article is the side that keeps the two lots even, and the cost per part article is the math the failure runs on, so the rework is the one the uneven lot earns. The reorder point article is the stock the check keeps to the pack, and the MOQ article is the minimum the lot needs to run. Send the grade and the lots to the quote request; MoTai confirms the check that keeps the lot to the spec and the paper it carries, and the even is the one the line reads on. The trial is the proof, the paper is the check, and the failure is the lot that does not ship.
