Running two suppliers on the same grade is the risk, because the two lots can read differently on the line, and the line is the one that pays for the uneven read. The buyer who keeps the two even is the one who runs the trial on the line and the receiving check on the lot, and this page is the buyer’s view of the risk, how to keep the two even, and the check that settles it.
| The side | What it is |
|---|---|
| The risk | The two lots reading differently on the line |
| The even | The lot that reads the same against the spec |
| The check | The trial and the receiving read |
The risk is the two lots reading different
The risk of running two suppliers is the two lots reading differently on the line, because the same grade on two lots is not the same cut, and the line is the one that pays for the uneven read. The supplier evaluation guide is the check that settles the two, and the total cost article is the math the risk runs on, because the cost is the rework the uneven lot earns. The quality process is the lot the even one is made on, and the risk is the one the check is built to keep off the line.
The even is the trial on the line
The even is the trial on the line, and the trial is the one that proves the lot against the work before the two are run together. The trial sample guide is the stage that proves the lot, and the receiving lot check is the read that keeps the two to the spec it was ordered against. The cost per part article is the number the even lot earns, and the trial is the one that keeps the number to the read. The even is the lot that reads the same, and the trial is the one that proves it.
The check is the paper the lot carries
The check that settles the two is the paper the lot carries, and the COC and COA article is the side that keeps the lot to the even read. The pack label article is the label the lot is confirmed to, and the packing standards article is the pack the even lot ships in. The MOQ article is the minimum the lot needs, and the reorder point article is the stock the check keeps to the pack. Send the grade you run and the other supplier’s spec to the quote request; MoTai confirms the lot that reads even on the line, and the check is the one that keeps the two to the spec. The risk is the uneven read, the even is the trial, and the check is the paper that settles it.
