The scheduled supply program is the one that keeps the line stocked against the consumption, and it is not the order, it is the program: the pack is set to the consumption, delivered against the schedule, and the line is the one that runs on it without the stock-out. The buyer who sets the program to the duty is the one who does not stop the line for the lead time, and this page is the buyer’s view of the program, how it runs, and the check that keeps it to the duty.
| The side | What it is |
|---|---|
| The pack | The one set to the consumption |
| The schedule | The one the delivery runs on |
| The lot | The one the pack ships on, the paper it carries |
The pack is set to the consumption
The first side of the program is the pack, and the pack is the one set to the consumption, because the consumption is the rate the line runs the pack against and the program is what keeps the stock to it. The reorder point article is the stock the program sets, and the starter stock guide is the way the first pack is sized against the machines, so the program is the side the first pack grows into. The MOQ article is the minimum the lot needs, and the pallet load article is the bulk pack the steady duty earns, because the program is the one the bulk runs on. The pack is the first side, and the consumption is what it is set to.
The schedule is the one the delivery runs on
The second side is the schedule, and the schedule is the one the delivery runs on, because the program is the side of the order that keeps the pack to the consumption without the stock-out. The shipping and OEM page is the side of the order the program runs on, and the terms guide is the money side the delivery runs on, so the term is the one that sets who carries the leg the schedule is planned against. The lead times guide is the window the schedule is built to, and the reorder point article is the check that the delivery does not run past. The schedule is the second side, and the delivery is what it runs on.
The lot is the one the pack ships on
The third side is the lot, and the lot is the one the pack ships on, because the program is the side that keeps the pack to the lot it was ordered against. The COC and COA article is the paper the lot carries when it ships, and the receiving lot check is the read that keeps the pack to the order it was named on. The pack label article is the label the lot is confirmed to, and the quality process is the check the lot is made on. Send the consumption and the line to the quote request; MoTai sets the scheduled program to the duty, with the delivery confirmed, and the program is the one that keeps the line stocked against the consumption. The three sides are the program, and the consumption is what they run on.
