The rework question is the one that settles on the cut and the cost, because the surface is the one that has to take the grit and the part is the one that has to carry the duty. The buyer who reads the two is the one who does not pay the replace for a surface the cut carries, and this page is the buyer’s view of the two, when the surface earns the rework, and when the part earns the replace.
| The side | When it earns it |
|---|---|
| The rework | The cut carries the stage, the cost runs against the surface |
| The replace | The cut does not carry the stage, the cost runs against the part |
The rework is when the cut carries the stage
The surface earns the rework when the cut carries the stage, and the cut is the one the grit sets against the surface. The removal rate article is the cut logic the rework runs on, because the removal is what the grit does to the surface, and the grit guide is the band the stage sits on. The grain shape article is the shape that cuts the rework, and the grit 120 article is the middle the rework reads on. The metal finishing sequence is the stage logic the rework runs on, and the rework is the one the cut carries. The surface is what the rework is read on, and the cut is what earns it.
The replace is when the cut does not carry the stage
The part earns the replace when the cut does not carry the stage, and the total cost article is the math that settles the replace, because the cost is the one the replace runs against. The cost per part article is the number the rework runs against, and the belt life article is the changeover the rework sets on the surface. The MOQ article is the minimum the replace lot needs, and the quality process is the check the part runs against. The replace is the one the cut does not carry, and the cost is what settles it.
The check reads the two against the spec
The check that reads the two is the one the surface finish article runs on, because the Ra is the read the rework is measured on and the spec is what it is set against. The sanding marks article is the failure the rework keeps off the surface, and the receiving lot check is the read the part lot runs against. The grade consistency article is the check that keeps the grit even across the rework lots, and the COC and COA article is the paper the lot carries. Send the surface and the duty to the quote request; MoTai points to the grit that earns the rework and the cost that settles the replace, and the check is the one that reads the two against the spec. The rework is the cut, the replace is the cost, and the check is what reads the two.
