The lead time runs by the pack type, not the grade alone, because the case, the pallet, and the custom run are the three that set the window the buyer plans against. The case is the fast one, the pallet is the scheduled one, and the custom run is the longest, and this page is the buyer’s view of the three, how each sets the window, and what to plan against it.
| Pack | The lead time | The read |
|---|---|---|
| The case | The fast one, the stock draw | The pack the small duty runs |
| The pallet | The scheduled one, the program | The pack the line earns |
| The custom run | The longest, the label built to spec | The pack the OEM runs on |
The case is the fast one
The case is the fast pack type, and it earns its lead time on the stock draw, because the case is the pack the small duty runs and the stock is the one it draws from. The lead times guide covers the range the case sits on, and the MOQ article is the minimum the pack needs to run, so the case is the one the minimum is read on. The starter stock guide is the way the first pack is sized, and the packing standards article is the pack the case ships in. The case is the fast one, and the stock draw is what it earns.
The pallet is the scheduled one
The pallet is the scheduled pack type, and it earns its lead time on the program, because the pallet is the pack the line earns on the steady consumption and the program is the side it runs on. The scheduled supply program is the side the pallet runs on, and the pallet load article is the bulk side that the lead time is set against. The reorder point article is the stock the window is set against, and the terms guide is the money side the leg runs on. The pallet is the scheduled one, and the program is what it carries.
The custom run is the longest
The custom run is the longest pack type, and it earns its lead time on the label and the grade built to the spec, because the custom run is the one the OEM program runs on and the label is the side it is built into. The OEM branding process is the stage the custom run runs on, and the pack label article is the label the run carries. The sample-to-volume guide is the order the custom run is built in, and the COC and COA article is the paper the lot carries when the run ships. Send the pack type and the quantity to the quote request; MoTai confirms the lead time the pack runs on and the window to plan against. The three pack types are the window, and the production and the leg are what they run on.
