Supplier qualification is the side to read before the first order, not the checklist that settles the two, because the qualification is what the supplier reads against the duty and the checklist is what the buyer runs against the supplier. It is the read that keeps the supplier to the lot before the pack ships, and this page is the buyer’s view of the qualification against the three sides it reads and the duty it keeps the supplier to.

The qualification, at a glance
The sideWhat it is
The capabilityThe one the audit reads
The QCThe one the paper carries
The lotThe one the grade keeps even

The capability is what the audit reads

The capability is the side the audit reads, because the qualification only holds when the supplier reads against the duty it is set to. The supplier audit article is the capability read the qualification runs on, and the evaluate article is the checklist the audit runs against, so the checklist is what the two read on. The COC and COA article is the paper the lot carries through the clear, and the import documents article is the set the supplier ships on. The capability is what the qualification is picked to, and the audit is what it reads.

The QC is what the paper carries

The QC is the side the paper carries, because the lot only reads even when the paper reads to the grade the qualification sets. The grade consistency article is the check that keeps the lot even across the runs it carries, and the receiving lot check article is the read that keeps the pack to the order when it lands. The COC and COA article is the paper the QC carries, and the lot traceability article is the number that runs back to the run. The QC is what the qualification reads against, and the paper is what it carries.

The lot keeps the supplier to the duty

The lot is the side that keeps the supplier to the duty, because the qualification only works when the supplier reads against the lot it is set to. The supplier scorecard article is the read after the order, and the supplier on-time article is the side the qualification runs against the lead time, so the on-time is what the lot reads on. The damage claim article is the read the lot clears when the pack fails, and the quality process covers the lot the supplier comes on. Send the duty and the supplier it reads to the quote request; MoTai points to the side that qualifies the supplier and the read that keeps it to the lot. The capability is the read, the QC is the paper, and the lot is what keeps the supplier to the duty.