The landed cost and the MOQ are the two that settle the pack, because the cost is the number the leg carries to the dock and the MOQ is the minimum the lot needs to be worth the carry. The buyer who reads the two against each other is the one who does not pay the leg against a lot that does not run, and this page is the buyer’s view of the two, how they run against each other, and the check that settles the pack.
| The side | What it is |
|---|---|
| The landed cost | The number the leg carries to the dock |
| The MOQ | The minimum the lot needs to run |
| The settle | The one the two run against each other |
The landed cost is what the leg carries
The first of the two is the landed cost, and the cost is the number the leg carries to the dock, because the leg is what the load takes and the clearing is what it lands on. The landed cost article is the number the leg carries, and the terms guide is the side that sets who pays the leg, so the term is what the cost is read on. The customs guide is the clearing the load lands on, and the freight forwarder article is the side that books the leg. The cost is the first of the two, and the leg is what it carries to the dock.
The MOQ is what the lot needs to run
The second of the two is the MOQ, and the MOQ is the minimum the lot needs to run, because the lot is what the pack is built into and the minimum is what the lot is worth. The MOQ article is the minimum the pack earns, and the pallet load article is the bulk side the MOQ runs on, so the bulk is what the minimum is read on. The packing standards article is the pack the lot ships in, and the starter stock guide is the way the first pack is sized against the minimum. The MOQ is the second of the two, and the lot is what it needs to run.
The two run against each other on the pack
The two run against each other on the pack, because the cost is what the pack carries to the dock and the MOQ is what the lot needs to be worth the carry, and the total cost article is the math the two settle on. The cost per part article is the number the pack settles on the part, and the reorder point article is the stock the pack sets against the lead time. The quality process covers the lot the pack comes on, and the grade consistency article is the check that keeps the lot even across the runs. Send the pack and the destination to the quote request; MoTai confirms the landed cost the pack carries and the MOQ the lot needs to run, and the two are what settle the pack. The cost is the carry, the MOQ is the minimum, and the two are what run against each other.
