The machine retrofit is the side that adds a new form to the pack, not a new brand, because the retrofit is the one that keeps the existing pack running and adds the form the new machine takes. The buyer who reads the retrofit against the existing pack is the one who does not over-buy the form the machine does not take, and this page is the buyer’s view of the retrofit, what it adds to the pack, and what it earns against the existing line.
| The side | What it is |
|---|---|
| The new form | The one the machine takes |
| The existing pack | The one the retrofit keeps running |
| The earn | The one the new form carries to the line |
The new form is the one the machine takes
The first side of the retrofit is the new form, and the new form is the one the machine takes, because the machine is what the retrofit is built around and the form is what it picks. The by-machine guide is the match that keeps the form to the machine, and the disc size selection guide is the diameter the machine picks on, so the form is the one the machine is confirmed to. The disc attachments article is the axis the retrofit picks on the machine, and the belt width by work article is the strip the sander takes on the line. The new form is what the machine picks, and the pack is what it is added to.
The existing pack is the one the retrofit keeps running
The second side is the existing pack, and the existing pack is the one the retrofit keeps running, because the retrofit is the side that does not stop the line for the new machine, it adds the form to the pack that is already on the line. The starter stock guide is the way the pack is sized against the machines, and the total cost article is the math the retrofit runs on, so the cost is the one the existing pack carries. The reorder point article is the stock the new form sets against the lead time, and the scheduled supply program is the side that keeps the pack to the new form without the stock-out. The existing pack is what the retrofit keeps running, and the new form is what it adds.
The earn is the one the new form carries to the line
The third side is the earn, and the earn is the one the new form carries to the line, because the retrofit is the side that earns the form on the machine it is built to. The grit guide is the band the form sits on, and the which grit for the work article is the quick read the stage earns. The quality process covers the lot the form comes on, and the receiving lot check is the read that keeps the new form to the spec it is added to. The US demand article is the stream the retrofit runs on, and the general industry guide is the side the retrofit carries to the line. Send the machine and the line it replaces to the quote request; MoTai points to the form the retrofit adds and the pack it updates. The retrofit is the three sides, and the new form is what it earns on the line.
