Three quotes on the same abrasive pack do not differ on the price line, and the difference is the grade and the lot, because the price is the number the two buy. The buyer who settles the quote reads the grade and the lot, not the number, and this page is the reader’s view of the three quotes, the line that settles it, and the check that keeps the grade to the spec.
| The line | What it is | The check |
|---|---|---|
| The grade | The one the spec names | The technical reference |
| The lot | The one the pack ships on | The supplier’s check |
| The price | The number the two buy | The total cost |
The price is the number the two buy
The three quotes differ on the price, and the price is the number the grade and the lot buy, because two quotes at the same price can be the two grades and the two lots. The total cost article is the math the price runs on, and the supplier evaluation guide is the side that checks the lot behind the number. The price is the line the buyer reads first, and it is the one that does not settle it, because the number is what the two behind it buy. The grade and the lot are the two the price is the sum of.
The grade is the one the spec names
The line that settles it is the grade, and the grade is the one the spec names, not the one the quote wants to sell. The technical specs page is the reference the grade is read against, and the grit standards FAQ is the standard the grade is set to, because the FEPA and ANSI numbers are the two the grade sits on. The grit guide is the band the grade is the one, and the check is the grade against the spec, so the quote that names the grade the spec does not is the one that reads off the line. The grade is the line that settles the three.
The lot is the one the pack ships on
The last line is the lot, and the lot is the one the pack ships on, because the grade is what the lot is produced to. The packing standards article is the pack the lot ships in, and the COC and COA article is the paper the lot carries when it ships, so the buyer who settles the quote settles the lot and the paper together. The supplier evaluation guide is the side that checks the lot, and the quality process is the check the lot is made on. Send the pack spec and the three quotes to the quote request; MoTai points to the line that settles it, the grade and the lot, and the MOQ article is the minimum the lot needs to run. The three quotes are the number, and the two behind it are what settle them.
