The 75 and the 100 are the two light widths in the range, and the step between them is the cut the medium line earns: the 75 is the light strip the detail work runs, and the 100 is the wider strip the medium line steps up to. The width is the axis the machine sets, and this page puts the two against the work each one earns and the step that moves the line to the wider one.

The two light widths, at a glance
BeltThe stripThe line it runs
75 mmThe light stripThe detail work, the small sander
100 mmThe wider stripThe medium line, the busier stock

The 75 is the light strip

The 75 belt is the light strip, and it earns the detail work, the work that the small sander runs without the wider cut. The 533 x 75 model page carries the spec, and the belt family guide is the two axes the strip is picked on, with the width the machine’s and the length the duty’s. The removal rate article is the cut logic the light line runs on, and the belt life article is the changeover the duty sets on the strip. The 75 is the width the detail work takes, and the small sander is what it runs on.

The 100 is the wider strip

The 100 belt is the wider strip, and it earns the medium line, the work the light sander takes when the line steps up from the 75. The 610 x 100 model page carries the spec, and the belt tracking guide is the joint check the wider strip runs on, because the medium line is where the tracking reads. The total cost article is the math the step runs on, because the cost is the passes against the work and the wider strip is the one that carries the medium duty. The scheduled supply program is the side the medium line runs on. The 100 is the width the medium line takes, and the busier stock is what it is built around.

The step runs on the machine and the duty

The step between the two light widths runs on the machine and the duty, not the catalog, because the machine is built to the width and the duty is what the line is built around. The by-machine guide is the match that keeps the strip to the machine, and the belt width by work article is the axis the width is picked on, so the width is the constant and the duty is what it earns. The joint types article is the close the machine is confirmed to, and the quality process covers the lot the strip comes on. Send the line and the stock to the quote request; MoTai points to the width the sander takes and the pack the line consumes. The two widths are the light range, and the duty is what picks the one.