The US is four sourcing regions and two main ocean lanes, and the choice of region is not a preference — it is where the program’s two facts meet. The first fact is the industries the program feeds, and that sets the product range. The second is the sites it serves, and that sets the lane and the distribution point. The region is where the two come together, and this page is the national view that picks the region before the order, with the lane and the distribution decision that follow it.

The two facts that pick the region
  1. The industries — what the program feeds, which sets the product range
  2. The sites — where the program serves, which sets the lane and the distribution point

The industries set the range, the sites set the lane

The program’s product range comes from the industries it feeds, and that is the first fact. A program that feeds shipbuilding and oil and gas runs the heavy-removal families and the grit progressions the shipbuilding and oil and gas pages describe; a program that feeds furniture and panel lines runs the finishing families and the grit sequences the woodworking page carries. The range is set by the work, and it is the same on every lane. The sites set the lane, because the receiving point decides whether the goods run on the West Coast, the Gulf, or the East Coast, and the regional guides carry the lane detail for each region.

The four regions, by what they concentrate

Each region concentrates a different mix, and the program picks the one its sites sit in:

Region What it concentrates The lane that serves it
West West Coast manufacturing and marine West Coast lane, the shorter transpacific
South Shipbuilding and oil and gas Gulf lane
Midwest Auto belt and steel and fab Great Lakes or West Coast plus inland
Northeast Distribution and transshipment East Coast lanes

The West Coast guide, the Gulf guide, the Midwest guide, and the Northeast guide carry the lane and the timing detail for each region. The program picks the region its sites sit in, and the lane and the inland leg follow from that.

The distribution point is the multi-site decision

A program that feeds one site runs the ocean supply plus the one inland move, and no distribution point. A program that feeds several sites in one region runs the distribution point, so the ocean lands once at the port and the sites are supplied from that one point. The distribution point is the cost that the multi-site program pays for the convenience, and it earns it only at the sustained volume across the sites. The shipping and OEM page covers the distribution and the Incoterms that carry the lot, and the lane timing is confirmed in the quote, not assumed.

Send the two facts, and the region follows

The region is the answer to the two facts, not a guess. Send the industries the program feeds and the sites it serves to the quote request, and the team picks the lane and the region that fit the program, and the pack to match it. The technical specs page has the product reference the range is built on, and the regional guides carry the lane detail for each region. The region is where the program’s two facts meet, and the lane and the distribution point follow from it.