The first abrasive order is where the questions live, and they are the same questions every first-time buyer asks: the minimum order, the sample, the spec, the lead time, and the documentation. This page is the FAQ that answers them in the order a new buyer runs into them, with the link to the page that carries each one further. It is the resource that turns a first request into an order that does not need a second round.

The first-order questions, and where each one is answered
  • MOQ — confirmed per product and pack, not a generic minimum
  • Sample — the gate between the request and the volume run
  • Spec — the fields the quote is built on
  • Lead time — production plus ocean transit plus the inland leg
  • Documentation — the COC per lot, the COA where required

The minimum order is not a generic number

The first question is always the minimum, and the honest answer is that it is confirmed per product and pack, not pulled from a generic minimum. A first program starts with trial quantities that test the grit and the fit on your material, and the reorder is what the scheduled supply is built on. The procurement guide covers the spec that the trial carries, and the trial is smaller than the stock order by design, because it exists to confirm the grit before the commit.

The sample is the gate, not the formality

The sample question is whether the program will run on your material before the volume. The sample runs under your process, by your operator, on your material, and that is the check that the program is the one you asked for. The volume run starts only after the sample is approved, and the OEM and shipping page covers the sample-and-approval flow the program runs through. The sample is the control point, and it is the step that keeps the print and the spec on the request.

The spec is the order, in fields

The spec question is what the order has to carry for the quote to be the one you need. The product family and form, the size, the grit band, the backing or attachment, the quantity, and the destination are the fields the quote is built on, and the RFQ guide lists them in the order the buyer fills them. A spec that has the fields is a spec that quotes clean, and the fields are what the reorder is held to.

The lead time and the documentation

The lead time question is the window, and it is the production plus the ocean transit to the port plus the inland leg, and the shipping page describes the stages and the lane timing that the quote confirms. The documentation question is the COC per lot, and the COA where the grain or bond must be documented, and the quality page covers what is checked before the lot ships. Those are the two that travel with the goods, and they are the last of the first-order questions.

Send the work, and the answers come back against the spec

The FAQ is the map, and the order is the run. Send the work, the products, and the machine list to the quote request, and the team answers the questions against your spec, with the sample plan, the lead time, and the documentation list that the first program runs on. The grit guide and the technical specs page are the references the spec is built against.